Priced against awarded Australian contracts

Win more jobs.Without wearing the risk.

Upload the tender pack. Quantifyr reads the terms, measures the drawings and prices the work, then tells you whether your bid sits where it should and how likely the cost is to grow after you sign. Fast enough to price everything that comes in, not just what you have time for.

Start a bid

14-day trial · no card · built in Australia

Sheet A-101 · Ground floor1:100
FHWSA/CTANKGARAGE37.2PORCH 3.8ENTRY10.6BATH6.4HALL 3.2STAIRS9.0BED 110.9ROBE 2.7BED 210.2BED 310.2LDRY5.8WC3.8KITCHEN17.6LIVING / DINING21.016 00011 000N
Measured, under roof152.4
DetectedSheet A-101

Areas

  • garage×137.2
  • bedroom×331.3
  • living_dining×121.0
  • kitchen×117.6
  • hallway_entry×213.8
  • bathroom×210.2
  • stairs×19.0
  • laundry_util×15.8
  • outdoor×13.8
  • closet_robe×12.7
  • Under roof152.4

Symbols

  • door_single10
  • window_single5
  • basin_sink4
  • smoke_detector3
  • window_double3
  • col_rect2
  • door_sliding2
  • wc2
  • window_awning2
  • ac_unit1
  • bath1
  • cooktop_oven1
  • fridge1
  • garage_door1
  • hot_water_system1
  • stair_arrow1
  • water_tank1
Symbols detected41
Bid positionFitout · NSW
$1,229,404
YOUR BID · 62ND PERCENTILE
P10P50P90
Typical duration
14 MO
Variation risk
MEDIUM
Likely growth
1.18×
Allowance
$154,000
Smaller job, no tender pack? Talk it through instead and get a priced quote back.

The difference

Every other tool helps you price the job. We tell you if the price is right.

Producing a number is the easy part. The hard part is knowing whether that number wins the work without hurting you, and nothing else on the market can answer it, because nothing else is holding awarded contract data.

How it works

Three steps. Nothing to set up first.

No rate library to load, no templates to build, no weekend lost before you price anything. Your own rates get learned as you correct things, not entered up front.

  1. 01

    Drop the pack in

    Conditions, specification, drawings, bill of quantities. Whatever the client sent, in whatever shape they sent it.

    Tender conditions.pdf
    Specification.pdf
    Drawings A-101 to A-118.pdf
  2. 02

    It reads and measures

    Five agents work the pack in parallel and reconcile what they find. Drawings are measured, not guessed at.

    Commercial termsREAD
    Physical scopeREAD
    Drawings980 m²
  3. 03

    You get a bid, and a verdict

    A priced schedule with every rate sourced, and a read on whether the number sits where it should.

    Total$1,229,404
    62ND PERCENTILE
Sheet A-101 · Taking off0%
GARAGE37.2PORCH 3.8ENTRY10.6BATH6.4HALL 3.2STAIRS9.0BED 110.9ROBE 2.7BED 210.2BED 310.2LDRY5.8WC3.8KITCHEN17.6LIVING / DINING21.0

The takeoff

The drawing becomes the quantities.

Not traced by hand at eleven at night. Measured off the sheet, room by room, with the figure kept against the line it came from.

  • Floor area111.4
  • Under roof152.4
  • External wall54.0 m
  • Internal partitions62.0 m
  • Doors13 no
  • Windows10 no
  • Wet area16.0

The estimate

Every line, with the price and where it came from.

Your own rate wins if you have one. Then the Australian library. Then a grounded market search. Every line says which of the three it used, so you can see at a glance the handful worth checking rather than trusting a total.

  • PersonalA rate you have set. Always wins.
  • GlobalThe built-in Australian library.
  • GroundedA market search, shown as unconfirmed until you accept it.
Project typeCommercial fitout · 980 m²
Preliminaries$86,400
Site establishment, supervision, temp services86,400
Personal1 ls @ 86,400
Demolition$26,880
Strip out existing fitout, cart away26,880
Global420 @ 64
Structure$477,400
Steel framing, internal partitions328,600
Personal1,240 @ 265
Structural steel, mezzanine118,128
Global18.4 t @ 6,420
Bracing and connections30,672
Personal1 ls @ 30,672
Services$248,600
Mechanical, VAV reconfiguration164,640
Grounded980 @ 168
Electrical, GPO and data rough-in83,960
Personal1 ls @ 83,960
Finishes$207,760
Ceiling, plasterboard and grid207,760
Global980 @ 212
Provisional sums$70,600
Joinery allowance, client selection pending70,600
Grounded1 ls @ 70,600
Subtotal1,117,640
GST111,764
Total$1,229,404
Benchmark

62nd percentile. Sits inside the band for fitout work of this size in NSW. Jobs like this run about 14 months and are varied more often than not. Carry $154,000.

Where the prices come from

A single number is a guess. A range is a position you can defend.

Quantifyr benchmarks your bid against awarded Australian contracts, and tells you what usually happens to contracts like it after they are signed.

The band

Where your number sits, against real awarded prices.

The model returns a full set of percentiles, not a single figure, and the intervals are calibrated against contracts it never saw in training. So when the band says it should contain the answer, it does. Put your own number in and you get your percentile, plus the closest comparable contracts that actually got awarded.

Comparable awarded contracts
p10p50p90
P(final cost at or below x)
50%80%allowance

After you sign

The question everyone forgets to ask.

Contracts move. Scope creeps, someone finds rock, the client changes the kitchen. It is not random, it is patterned, so a second model predicts whether this job gets varied and how far the cost travels when it does. You get a risk level, a spread of likely outcomes, and a recommended allowance: a contingency figure with a reason behind it instead of the usual ten percent.

Scope

Houses are not tenders.

Government tender data describes government work. It does not describe a detached house in an outer suburb, and pretending otherwise is how benchmarks end up useless. Residential jobs run through a separate model built on building permit data instead.

Straight answers

The questions estimators actually ask.

The prices will be wrong for my area.
Your own rate wins if you have set one. After that it is the built-in Australian library, then a grounded market search, and every line tells you which of the three it used. The benchmark itself is state-aware, so a job in Darwin is not compared against a job in Sydney.
It will take a weekend to set up.
There is nothing to set up. You do not load a rate library or build templates before your first bid. Drop a pack in and you get a priced schedule back on the first attempt. Your rates get learned as you correct things, not entered up front.
I am not a computer person.
You upload a file, or you talk. That is the interface. If you can explain the job to your foreman you can use this, and the first bid takes minutes rather than a training course.
What if the AI gets the quantities wrong and I wear the cost?
Two answers. Every measurement traces back to the sheet and the spot on it, so you can check anything in seconds instead of trusting a total. And the quantities are computed by the engine, not written by the language model, which only classifies what it is looking at. Anything can be corrected before you send.
Are my drawings used to train your AI?
No. We trained our computer vision model on Australian house plans we sourced and annotated ourselves, in our own labelling software, not on customer work. Your documents are processed in ephemeral sessions and are not used to train third-party models either. If you ever want to contribute a set, that is something you opt into by asking us. Read the security page
What happens once I win it? The estimate goes in a drawer.
It does not. The estimate carries through: variations get priced against it, and progress claims are raised from it, so the number that won the job stays the number you are tracking against.

Who built it

Built by someone who lived the problem.

Quantifyr comes from an engineer with fifteen years across civil engineering and construction, on everything from local subdivisions to major infrastructure.

Then a stint at a construction-technology company building AI tools for the industry, where one thing became impossible to ignore: automated takeoff, risk modelling and market benchmarking existed, and were reserved almost entirely for Tier 1 contractors and government departments.

Everyone else was still pricing jobs the way they had for thirty years. Spreadsheets, gut feel, late nights, and numbers that were either too high to win or too low to survive.

The longer version →

Why you can check it yourself

  • Every quantity traces to the sheet

    Measurements point back to the drawing and the spot on it, so a number can be checked in seconds.

  • Every rate carries its source

    Personal, library or grounded market search, labelled on the line rather than buried in a total.

  • The engine does the arithmetic

    Quantities are computed deterministically. The model classifies what it is looking at, it does not invent figures.

  • Your work stays yours

    Documents are processed in ephemeral sessions and are not training data, for our models or anyone else's.

Pricing

Priced for a builder, not an enterprise.

Every plan starts with the same 14-day trial and no credit card. Price as many jobs as you like inside it, and if you have not put a real tender through by the end, ask and we will extend it.

Starter

Full features for 14 days.

Free

  • Voice to estimate
  • AI takeoff, 3 drawings
  • Personal rates
  • PDF export
Start a bid

Most popular

Pro

For working estimators.

$99/mo

  • Unlimited takeoff
  • Tender analysis
  • Benchmarking and risk
  • Branded proposals
  • Variations and claims
Start a bid

Team

Up to four seats.

$249/mo

  • Everything in Pro
  • Shared workspace
  • Audit trail
  • Priority support
Start a bid

Put one real tender through it.

That is the honest test. Take a job you have already priced, run the pack through, and see how close it lands and what it says about your number.

Start a bid

14-day trial · no card · built in Australia